Place: Leppington, South West Sydney New South Wales
Total area: 30200 m2
Year: 2024

Project Details

About the Project

JMT Civil were engaged for the construction of a 25-lot subdivision within the Camden Local Government Area

Site Considerations

Our scope of works involved 2,200cu.m earthworks, remediation, drainage installation, underground utilities, retaining walls, pavement construction & landscaping.

Considerations and development

The civil works for the 25-lot subdivision development in Leppington, NSW, involve the comprehensive planning, design, and construction of infrastructure required to support residential development. The scope of the civil works includes, but is not limited to, the following key components:

  • Site Preparation and Clearing

Initial site preparation will involve the removal of existing vegetation, structures, and any obstructions. This phase also includes grading the land to provide suitable levels for the future construction of roads, utilities, and residential lots.

  • Earthworks and Bulk Excavation

Excavation and earthmoving works will be carried out to ensure proper drainage and to create level building pads for each lot. The works will also include the shaping of roads and footpaths in accordance with the approved subdivision design.

  • Roadworks

The development will feature new internal roads, including:

Subgrade preparation: Excavation and compaction of the subgrade to ensure a solid base.
Pavement construction: Installation of roadbase, asphalt or concrete surface to the required thickness.
Kerb and gutter: Installation of concrete kerbing and gutters to manage stormwater runoff effectively.
Traffic management and signage: Placement of appropriate traffic control measures and street signage.

 
  • Electricity and Communications Infrastructure

Underground electrical and telecommunications lines will be installed to provide services to the new subdivision. This will include connections for power, telephone, and internet to each lot.

  • Landscaping and Environmental Works

The project will include soft landscaping around roads, parks, and green spaces. These works may involve planting trees, shrubs, and grassed areas to enhance the aesthetic value of the subdivision and promote local biodiversity.

  • Testing and Compliance

All works will be tested to ensure compliance with local regulations, including road quality, stormwater management, and utilities installation. Final inspections will be conducted by the relevant authorities before the subdivision is approved for occupancy.

The civil works are designed to create a safe, efficient, and sustainable living environment, ensuring that all necessary infrastructure is in place to support the residential development of the 25-lot subdivision.

You can adapt the specifics based on any additional features or requirements that the subdivision is approved for occupancy.